11/2/15 Update

  • The brick has been repaired and painted on the front and back exterior of the building.
  • The flooring in the Activity Room has been replaced
  • Vertical blinds have been installed in the Activity Room.
  • Vertical blinds have been installed in two of the bedrooms on the upper level.
  • A floor lamp has been added to the front bedroom on the upper level.
  • New lighting in the seating area on the main floor
  • We purchased a  Cricut for your use. Please bring your own mats and cartridges.

20150816_152803    DSC00871 - Cropped